Skip to content

INDUSTRIAL-EDGE & UTILITIES

Failover authentication for the twenty-five-year device.

Industrial sensors deployed today must outlive RSA. EdSSA Nano bootstraps post-quantum on first power, then authenticates locally for the device lifetime — through link outages, schema migrations, and operator transitions.

The problem

What today's M2M auth can't deliver in industrial-edge.

Industrial-edge operators deploy sensors and controllers with operational lifetimes of fifteen to twenty-five years. The authentication scheme that ships in firmware today must remain secure in 2045. Existing approaches rely on RSA or ECDSA certificates and depend on backhaul to a central PKI for renewal. Neither assumption survives regulatory post-quantum mandates and the operational reality of remote installations with intermittent backhaul.

How EdSSA addresses it

What EdSSA does differently here.

EdSSA Nano bootstraps post-quantum at deployment, discards the bootstrap material, and runs locally for the device lifetime. There is no certificate to renew, no PKI to call back to, and no quantum migration to schedule. EdSSA Fleet provides multi-tenant scale; EdSSA Edge validates at the gateway.

Use cases

Concrete operational scenarios.

  • Substation, wind-farm, and pipeline sensor authentication with multi-year backhaul gaps
  • Distributed-energy-resource (DER) authentication across thousands of sites
  • SCADA and ICS device authentication aligned with IEC 62443
  • Smart-meter populations authenticating to utility back-office without per-meter handshake load

Compliance & standards

Standards and regulatory regimes.

IEC 62443 alignment. EU NIS2 and CER directives. EU Cyber Resilience Act readiness. ENISA post-quantum migration guidance.

Audit emission

Per-action audit logging configurable per sensor or actuator. NIS2-compatible incident-reporting events, IEC 62443-aligned zone logging.

Customers

Operators in this vertical.

[CUSTOMER LOGO 1]
[CUSTOMER LOGO 2]
[CUSTOMER LOGO 3]
[CUSTOMER LOGO 4]
[CUSTOMER LOGO 5]
[CUSTOMER LOGO 6]
The post-quantum migration plan we did not have to write. Cryptography that is already past the cliff.
[CUSTOMER ROLE], [CUSTOMER COMPANY][PLACEHOLDER]

Operating in industrial-edge?

Set up an NDA call. We’ll walk through how EdSSA fits your specific operational envelope.

Set up an NDA call →